Spent about 5 hours today working on lowering the crane and stabilising the engine stand, too. Got the brackets for the rear wheels welded on and bolted up. 70 or 80mm lower! Down from about 180mm at the under-car end to about 115mm once I'm done. Should clear the bottom of the ute OK like this. Going to order some steel tomorrow to finish the job tomorrow night. Maybe I can pull the block tomorrow night,or tuesday night.
Pic of shitty low quality welds: https://twitter.com/FredCookeNZ/status/ ... 1268454400
Also added a stud for the handle to rest on when it's stowed. OEM setup simply didn't work at all.
Fred.